Invoice, COA, laser code and sample voltage / internal resistance verification against the approved cell.
Bench test of over-charge, over-discharge, over-current, short circuit and temperature cut-off thresholds.
Spot-weld pull test, weld resistance check, insulation and continuity inspection on every unit.
Three to five full cycles, then capacity sort; packs below 95% of nominal are rejected, not downgraded.
Charge and discharge on the original charger, insertion and latch check in the original tool, runtime comparison.
1.2 m drop test on sample units, AQL inspection, terminal cap, UN packaging and label verification.