For tool makers and brand owners who need a pack designed around their own interface, capacity target or cost envelope. We develop the pack, the protection board and the production process, then hand over a documented supply line.
We start from the mechanical and electrical interface: terminal geometry, latch, insertion feel, and the identification behaviour the charger expects.
Cell format, grade and protection thresholds are chosen against the tool's real load profile, not against a capacity headline.
Every development pack goes through capacity, thermal, abuse and drop testing, plus a full charger cycle on the original charger, before a production order is released.
| Development timeline | 8–12 weeks from interface confirmation to production-ready sample |
| Tooling | Quoted per project; ownership transferred on completion |
| Validation | Capacity, thermal, over-charge/discharge, short circuit, drop, charger cycle |
| Documentation | Drawings, BOM, test reports, process sheet, inspection standard |
| Volume | From 1,000 units per model per year |
| Exclusivity | Available by agreement for committed volumes |
Tell us the platform, the capacities and the destination market. We reply with the model list, certificate status and an indicative cost.
Request a quoteOr compare the other routes on the programmes overview.